Y. S., and Tay, C. C., P. A. . T. (2014) “INTERRELATIONSHIP BETWEEN AVAILABILITY WITH PLANNING FACTOR AND MEAN TIME BETWEEN FAILURES (MTBF) IN OVERALL EQUIPMENT EFFECTIVENESS (OEE)”, Journal of Advanced Manufacturing Technology (JAMT), 6(2). Available at: https://ojsdemo.utem.edu.my/jamt/article/view/20 (Accessed: 6July2025).